Powered by
TESOLUTION - TOTAL ENGINEERING SOLUTION IN WIND ENGINEERING & VIBRATION CONTROL
Switch to Korean

History


  • Foundation : Establishing Domestic Reputation (2001 - 2015)​
  • Expansion : Step Forward To the World and More (2016 - Present)
<
>
Picture

2022

Nov. Achieved over 250 wind tunnel tests for bridges
Mar. Wind Tunnel Test for Rach Mieu 2 Bridge, Vietnam

2021

Feb. Canakkale Bridge(the world's longest suspension bridge),
          Turkey
          – Completed the installation of 6 sets of 30t AMDs

Jan. Dubai I(the biggest Ferris Wheel in the world), Dubai, UAE
          – Completed the installation of two 45t & four 4t TMDs
Picture

2017

2024

May. Opening of a downtown office in Bundang

2023

Dec. Achieved over 850 wind tunnel tests for buildings
May. Opening of the 3rd lab for structural research
Jan. Fubon Life A25 Tower, Taipei, Taiwan
          – Completed the installation of 500t pendulum-type TMD
Picture

2020

​Nov. Greenland Center (the tallest residential build. in the city),
           Sydney, Australia
           – Completed the installation of 180t TMD
Nov. Opening of the 2nd Boundary Layer Wind Tunnel
Oct. Development of Korea’s first
        Wire-Rope Pendulum-Type TMD

2019

Oct. Haneda Bridge, Japan (In cooperation with Nichizo Tech.)
​          – Completed the installation of 20 sets of TMDs
Jan. Treasure Garden Residence, Taichung City, Taiwan
          – Completed the installation of 150t Pendulum-type TMD

2018

Sep. Achieved over 300 wind tunnel tests for buildings
Dec. Incheon International Airport, Incheon, Korea
           - Renewed  HMD for the Airport's Main ATC Tower

Nov. CTBUH 2017 Conference, Sydney, Australia
           - Participated as an exhibitor to demo AMD technology
Aug. Development of combined type Stockbridge Damper
           - In pursuit of controlling both low & high frequency vibration
              for stay-cables of Pyeongtaek Bridge, Korea
TMD for New York Wheel
Picture

2016

Dec. New York Wheel, NY City, USA
           - Completed the installation of TMDs
Dec. Awarded the Export Rookie of the Year from
           
Gyeonggi Exporter Association
Apr. Launched R&D for Stockbridge Damper to control
           structural cable vibration

2015

Aug. Incheon Airport Terminal 2 ATC Tower, Incheon, Korea
           - Launched a research project for the installation of 2 AMDs
Feb. 
Treasure Garden Residence, Taichung City, Taiwan
           - Launched a research project for the installation of TMD
Jan. 
 Dubai Eye, Dubai, UAE
           - Launched a
research project for the installation of 6 TMDs

2014

Dec. Certified with ISO9001:2008, ISO 14001, OHSAS18001:2007
Sep. Constructed  2nd Structural Laboratory 
            - Equipped with 2D Mid-sized Wind Tunnel
Jun. Conducted wind tunnel test for Chacao Bridge (Chile)
Taichung Treasure Garden - Pendulum type TMD(Taiwan)

2011

Dec. Completed construction of Test Tower
Nov. Conducted wind tunnel test for 2nd Bridge Across Nile at Jinja Bridge (Uganda)
Oct.  Developed and installed the floor TMD on Danjin Hyundai Steel Stockhouse 

2010

​Aug. Wind engineering consulting & Wind environment study
​Jun. Completed construction of Basin Test Facility at KOCED Ocean Environment Simulation Center 
Jun.  Developed Isolation Table System (Model ITS-2)
May.  Installed the biggest Tuned Mass Damper in Korea (160 tons, POSCO HQ TMD Project)
TESolution Boundary Layer Wind Tunnel

2007

Oct. Installation of the first Active-type Tuned Mass Damper in Korea (Ulsan L-Hotel AMD Project)

2006

Aug. ​Devoloped and installed the cantilever type footbridge TMD in Gunsan, Korea
Ulsan Lotte Hotel Active Mass Damper(AMD) for testing

2002

Oct.  Appointed Dr. Yun-seok Kim as the CEO of TESolution

2001

Dec . Began maintenance for Incheon International Airport Traffic Control Tower HMD​
Feb.
 Foundation of TESolution Co., Ltd.

Incheon International Airport ATC Active Mass Damper(AMD)

2013

Dec. Conducted wind tunnel test for Shangri-La Hotel, Ulaanbaatar (Mogolia)
Aug. Completed consturction of the Head Quarter of VicoSystem and 2nd Structural Laboratory

2012

​Dec. Conducted wind tunnel test for Vam Cong Bridge (Vietnam)
​Jul.  Developed the first HMD (Hybrid-type Mass Damper)  in Korea (Techno Mart HMD Solution Project)​
Chacao Bridge for Wind Tunnel Testing, Chile

2009

Oct. Developed and installed the first pendulum-type Tuned Mass Damper in Korea (Geoga Bridge TMD Project)
Sept. Began MOLIT funded research as a member of Super Tall Building Design & Engineering Technology (on-going)
May. Began MOLIT funded research as a member of Super Long Bridge Design & Engineering Technology

2008

Oct. Wind tunnel test for Al Reem Island NAVI & SOHO, Abu Dhabi , UAE
Dubai Eye Tuned Mass Damper(TMD) during the installataion

2005

Dec. Developed and installed the first laminated rubber bearing TMD for high-rise residential building(Busan Centumcity) in Korea
Oct. Completed construction of Wind Tunnel Laboratory and Structural Laborartory
Jun.  Completed construction of TESolution Head Quarter

2004

Dec.  Began construction of TESolution Head Quarter in Anseong-Si, Gyeonggi-do
Jul.  Established Research Center of TESolution Co., Ltd.
Tuned Mass Damper during the installation

TESolution
​Total Engineering Solution in Wind Engineering and Vibration Control
142 Seungjin-gil, Gongdo-eup, Anseong-si, Gyeonggi-do, 17563, Korea

Tel :  82-31-658-2906
Fax : 82-31-658-2908
Contact : [email protected]

​Copyright © 2016 TESolution
  • Home
  • About
    • CEO Message
    • History
    • Team
    • Certificate
    • CTBUH 2017
    • Location
  • Solutions
    • Vibration Control Technology
    • Wind Tunnel Test for Bridges
    • Wind Tunnel Test for Buildings
    • Computational Wind Engineering
    • Structural Health Monitoring​
  • Projects
    • Feature Projects
    • Feature Projects - Vibration Control Devices
    • Feature Projects - Wind Tunnel Tests
    • Track Record
  • Facilities
    • Vibration Control Facilities
    • Wind Tunnel Facilities
    • Equipment
    • Vibration Exciters
  • News
  • Contact
  • Site Map
  • Home
  • About
    • CEO Message
    • History
    • Team
    • Certificate
    • CTBUH 2017
    • Location
  • Solutions
    • Vibration Control Technology
    • Wind Tunnel Test for Bridges
    • Wind Tunnel Test for Buildings
    • Computational Wind Engineering
    • Structural Health Monitoring​
  • Projects
    • Feature Projects
    • Feature Projects - Vibration Control Devices
    • Feature Projects - Wind Tunnel Tests
    • Track Record
  • Facilities
    • Vibration Control Facilities
    • Wind Tunnel Facilities
    • Equipment
    • Vibration Exciters
  • News
  • Contact
  • Site Map