History
2017Dec. Renewal of HMD for Incheon International Airport Main ATC Tower
Nov. Participated in CTBUH 2017 Sydney Conference as an exhibitor to demo Active Mass Damper technology Aug. Combined type Stockbridge Damper developed to control low frequency and high frequency vibration for the stay cables of Pyeongtaek Bridge, Korea |
2016Mar. Began New York Tuned Mass Damper Project (USA)
Apr. Began R&D of Stockbridge Damper for structural cable vibration control Dec. Won the Export Rookie of the Year Award from Gyeonggi Exporter Association |
2015Aug. Began Incheon Airport Terminal 2 Air Traffic Tower, Active-type Tuned Mass Damper Project (Korea)
Feb. Began Taichung Treasure Garden Residence, Tuned Mass Damper Project (Taiwan) Jan. Began Dubai Structure Tuned Mass Damper Project (UAE) 2014Dec. Certified with ISO9001:2008, ISO 14001, OHSAS18001:2007
Sept. Completed construction of 2D Mid-sized Wind Tunnel, 2nd Structural Laboratory Jun. Conducted wind tunnel test for Chacao Bridge (Chile) 2011Dec. Completed construction of Test Tower
Nov. Conducted wind tunnel test for 2nd Bridge Across Nile at Jinja Bridge (Uganda) Oct. Developed and installed the floor TMD on Danjin Hyundai Steel Stockhouse 2010Aug. Wind engineering consulting & Wind environment study
Jun. Completed construction of Basin Test Facility at KOCED Ocean Environment Simulation Center Jun. Developed Isolation Table System (Model ITS-2) May. Installed the biggest Tuned Mass Damper in Korea (160 tons, POSCO HQ TMD Project) 2007Oct. Installation of the first Active-type Tuned Mass Damper in Korea (Ulsan L-Hotel AMD Project)
2006Aug. Devoloped and installed the cantilever type footbridge TMD in Gunsan, Korea
2002
Oct. Appointed Dr. Yun-seok Kim as the CEO of TESolution
2001
Dec . Began maintenance for Incheon International Airport Traffic Control Tower HMD
Feb. Foundation of TESolution Co., Ltd. |
2013Dec. Conducted wind tunnel test for Shangri-La Hotel, Ulaanbaatar (Mogolia)
Aug. Completed consturction of the Head Quarter of VicoSystem and 2nd Structural Laboratory 2012Dec. Conducted wind tunnel test for Vam Cong Bridge (Vietnam)
Jul. Developed the first HMD (Hybrid-type Mass Damper) in Korea (Techno Mart HMD Solution Project) 2009Oct. Developed and installed the first pendulum-type Tuned Mass Damper in Korea (Geoga Bridge TMD Project)
Sept. Began MOLIT funded research as a member of Super Tall Building Design & Engineering Technology (on-going) May. Began MOLIT funded research as a member of Super Long Bridge Design & Engineering Technology 2008Oct. Wind tunnel test for Al Reem Island NAVI & SOHO, Abu Dhabi , UAE
2005
Dec. Developed and installed the first laminated rubber bearing TMD for high-rise residential building(Busan Centumcity) in Korea
Oct. Completed construction of Wind Tunnel Laboratory and Structural Laborartory Jun. Completed construction of TESolution Head Quarter 2004
Dec. Began construction of TESolution Head Quarter in Anseong-Si, Gyeonggi-do
Jul. Established Research Center of TESolution Co., Ltd. |