Temburong Bridge (Wind Tunnel Testing)


Temburong Bridge,Brunei (WIND RESISTANT DESIGN)
Temburong Bridge, Brunei
​​Temburong bridge is a 30 km long bridge that links Jalan Utama Mentiri in Brunei-Muara district with Jalan Labu in Temburong district. There are two cable stayed bridges: the Eastern Channel Bridge and the Brunei Channel Bridge. The Eastern Channel Bridge is a cable stayed bridge with 2 pylons and has the total length of  520m (130m + 260m + 130m = 520m) with 30.2m width concrete deck. The Brunei Channel Bridge is a cable stayed bridge with 1 pylon and has the total length of  290m (145m + 145m = 290m) with 37.2m concrete deck

The wind tunnel tests and analyses were carried out to investigate the wind-induced behaviors of the bridge during and after construction. The items of tests and analyses are described as follows: 

​The wind tunnel tests and analyses were carried out to investigate the wind-induced behaviors of the bridge during and after the construction. The items of tests and analyses are described as follows: 

Wind Tunnel Test/Analysis Conducted:

▣ Section model test of bridge deck
▣ Section model test of pylon leg
▣ Aeroelastic model test of free standing pylon
▣ Aeroelastic model test of full bridge
▣ Wind shield model test
▣ Wind-resistant design of hanger cable


TESolution
​Total Engineering Solution in Wind Engineering and Vibration Control
142 Seungjin-gil, Gongdo-eup, Anseong-si, Gyeonggi-do, 17563, Korea

Tel :  82-31-658-2906
Fax : 82-31-658-2908
Contact : [email protected]

​Copyright © 2016 TESolution
  • Home
  • About
    • CEO Message
    • History
    • Team
    • Certificate
    • CTBUH 2017
    • Location
  • Solutions
    • Vibration Control Technology
    • Wind Tunnel Test for Bridges
    • Wind Tunnel Test for Buildings
    • Computational Wind Engineering
    • Structural Health Monitoring​
  • Projects
    • Feature Projects
    • Feature Projects - Vibration Control Devices
    • Feature Projects - Wind Tunnel Tests
    • Track Record
  • Facilities
    • Vibration Control Facilities
    • Wind Tunnel Facilities
    • Equipment
    • Vibration Exciters
  • News
  • Contact
  • Site Map
  • Home
  • About
    • CEO Message
    • History
    • Team
    • Certificate
    • CTBUH 2017
    • Location
  • Solutions
    • Vibration Control Technology
    • Wind Tunnel Test for Bridges
    • Wind Tunnel Test for Buildings
    • Computational Wind Engineering
    • Structural Health Monitoring​
  • Projects
    • Feature Projects
    • Feature Projects - Vibration Control Devices
    • Feature Projects - Wind Tunnel Tests
    • Track Record
  • Facilities
    • Vibration Control Facilities
    • Wind Tunnel Facilities
    • Equipment
    • Vibration Exciters
  • News
  • Contact
  • Site Map