From Aug. 24th to 29th, TESolution vibration control team completed the 1st phase(P9) of the installation of the vibration control device on the #3 tower of the Geoga Bridge's cable-stayed bridge for controlling the wind load.
The vibration control device on the #3 tower is a pendulum type TMD that is designed to control longitudinal movement.
1 Comment
4/3/2023 07:13:16 am
This blog post on the installation of a vibration control device on the 3rd main tower of the Geoga cable-stayed bridge section is an insightful read for anyone interested in the engineering and construction of large infrastructure projects. The post provides detailed information on the purpose and function of the vibration control device, as well as the installation process itself, highlighting the innovative techniques and cutting-edge technology used to achieve the desired outcome. The use of such devices is crucial in ensuring the safety and longevity of large bridges and other infrastructure, and this post serves as an excellent example of the skill and expertise required to undertake such complex engineering projects.
Reply
Leave a Reply. |
News from TESolutionArchives
January 2025
|